See where projects are clustered, how much power they need, and how new grid demand can affect Oklahoma electric bills.
Quick Answer
Baxtel lists 57 Oklahoma facilities as of September 5, 2026. A facility listing is not necessarily a separate campus or an operating site; counts depend on how proposed projects and multi-building campuses are grouped.
Directory count checked September 5, 2026. The map retains May 27, 2026 project and resident-report locations; dated markers are not a live construction register.
The Scale
Sources: Baxtel directory, Google Oklahoma, IREN February 2026 announcement, Meta Tulsa announcement.
Baxtel facility listings
Directory count: September 5, 2026
MW at IREN’s planned campus
Power ramp scheduled from 2028
Google’s investment in Oklahoma
Company-reported statewide investment
HB 2992 load threshold
Qualifying large-load customer protections
The Map
Use the map to compare confirmed project clusters, utility-facing load centers, and resident-reported ZIP signals reviewed on May 27, 2026.
Dots are anchored to city, county, site, or ZIP coordinates and nudged apart in dense areas. Dashed lines point back to the original location. Red markers show resident-reported ZIP signals, not verified facility ownership.
Dense corridors are expanded below so nearby projects and report ZIPs do not sit on top of each other.
Claremore, Owasso, Tulsa, Broken Arrow and Strang
Piedmont, Yukon, Luther and Oklahoma City ZIPs
Payne, Lincoln and Creek County report corridor
Muskogee, Oktaha, Okmulgee and Kiowa
Selected Marker
Pryor
MidAmerica Industrial Park campus and Oklahoma anchor facility.
Source: Company and Oklahoma reporting
Baxtel Oklahoma facility listings
57
Directory count checked September 5, 2026; not an operating-site total
Oklahoma project markers shown
11
May 2026 project clusters and utility-facing load centers
Resident report entries reviewed
25
Oklahoma entries bucketed into 17 ZIP markers
IREN announced campus capacity
1,600 MW
February 2026 announcement; power scheduled to ramp from 2028
Northeast corridor: Claremore, Owasso, Tulsa, Broken Arrow, Strang and Muskogee-area ZIPs
Central corridor: Stillwater, Davenport, Stroud, Luther, Piedmont, Yukon and Oklahoma City ZIPs
Southeast corridor: Okmulgee, Oktaha / Council Hill and Kiowa ZIPs
Red ZIP markers show resident reports and are not counted as confirmed projects.
Sources: News9, The Frontier, SPP
The Major Players
May 2026 project inventory, with Meta and IREN announcement corrections checked September 5, 2026. Other listed construction stages, estimates and utility assignments reflect that earlier inventory.
| Project | Location | MW | Investment | Status | Utility |
|---|---|---|---|---|---|
| Google (5 confirmed + 1 unconfirmed) | |||||
| Pryor | MidAmerica Industrial Park, Mayes County | 400+ est. | $4.4B+ | Operating | GRDA |
| Stillwater | Payne County, 400 acres | TBD | Up to $3B | Building | OG&E |
| Sand Springs (Project Spring) | Hwy 97, 827 acres | TBD | Part of $9B | Approved | PSO |
| Muskogee (Summit + Council Hill) | Muskogee County, 2 campuses | TBD | Part of $9B | Planned | OG&E |
| Project Clydesdale (unconfirmed) | Near Owasso, 506 acres | TBD | $1B | Building | PSO |
| Other Hyperscale | |||||
| Meta Tulsa (Project Anthem) | East Tulsa, 340+ acres | Not disclosed | $1B+ | Building | PSO |
| IREN Oklahoma | Woods County (Alva), 2,000 acres | 1,600 | TBD | Announced February 2026 | SPP |
| Core Scientific / CoreWeave | Port of Muskogee | 100 | $4B | Building | OG&E |
| Polaris (Project Bifrost) | Port Muskogee | 200 | $100M | Operating | OG&E |
| Beltline / Gamma (Yukon) | I-40 / N. Frisco Rd, Yukon | 500 | ~$1B | Stalled | OG&E |
| CloudBurst OKC | 2000 S Council Rd, OKC | 60 | TBD | Planned | OG&E |
| Chickasha (Behind-the-Meter) | Chickasha Airport Industrial Park | TBD | $3.5B | Planned | Self-gen |
Sources: News9, The Frontier, Nathan Hammer, Baxtel, Google
The Grid
Large-load proposals require utilities to plan additional generation and transmission. A forecast is not a guaranteed shortage or an approved increase to your household bill.
In December 2025, The Frontier reported forecast gaps of 3,124 MW for PSO by 2031 and 3,459 MW for OG&E by 2035 without additional resources. These estimates use different forecast years and should not be added into a single statewide shortage. The Southwest Power Pool’s large-load process describes regional interconnection planning.
Transmission congestion can raise the cost of delivered power. Who pays for new infrastructure depends on the applicable contract, tariff and regulatory decision.
Large-load projects can require new power plants, transmission lines and substations. The household effect depends on approved tariffs and cost-allocation rules. Review the current utility-rate tracker for residential impacts.
September 2026 filing: OG&E describes its rate review as separate from the large-load tariff proceeding and says it excludes impacts from increased data-center electricity use. Follow the rate-case tracker for the residential proposal.
2031 forecast gap reported December 2025
2035 forecast gap reported December 2025
Forecast excludes later resource and load changes
The Cost
Tax incentives affect local revenue as well as project economics. Compare promised investment and jobs with the taxes collected and public services required.
In June 2022, The Frontier reported more than $239 million in property-tax exemptions and $113.9 million in income-tax credits for Google in Oklahoma. These historical figures are not a current subsidy total.
Local incentive agreements vary. Compare the actual agreement, payments in lieu of taxes, job commitments and public-service obligations before estimating a community’s benefit.
The Response
Two enacted laws address large-load cost allocation and private generation. Their protections and requirements depend on the project and utility arrangement.
| Bill | What It Does | Status |
|---|---|---|
| HB 2992 | Cost-allocation protections and landowner notification for qualifying loads of 75 MW or more | Approved by governor May 2026. |
| SB 480 | Allows qualifying private industry to develop behind-the-meter power; does not require every data center to self-generate | Signed into law (May 2025) |
Sources: Oklahoma House, Governor: SB 480 signed, Oklahoma Legislature
Next Step
Compare solar, battery backup and financing using your home's electric bills.
Install scope
Review the panel, roof, utility and electrical scope before choosing solar.
Review solar panelsBackup power
If outages and grid strain are the concern, compare bill savings separately from backup-power value.
Compare battery storageSolar proposal
Compare estimated system size, pricing and savings using your address, monthly bill and utility.
Free Instant ProposalCommon Questions
Project facts reviewed September 5, 2026. OG&E rate-review note checked October 5, 2026. Project-map and inventory dates are stated beside those sections.